Tengizchevroil LLP (TCO) operates as a subsidiary of Chevron Corporation in Kazakhstan since 1993. Its focus is to explore, develop, produce, and market crude oil, liquid petroleum gas, dry gas, and sulfur in this country. It also exports its products to Europe, the Americas, China, Russia, the Mediterranean countries, Central Asia, and international markets.
Total manhour for this project is 14,580.
SCOPE OF WORK
- Supply 6 units + 1 reserve electrical vacuum pump c/w accessories.
- Provide storage tank for pumped out groundwater for each dewatering pump.
- Maintain the proper condition of the equipment including the implementation of the current and capital repairs and replacement of parts, liquids, etc.
- Provision of equipment spare parts and accessories.
In The Karachaganak Field, Republic Of Kazakhstan
Karachaganak Petroleum Operating B.V. (KPO) was founded in 1984 and is based in Aksay, Kazakhstan. KPO is engaged in extracting, processing, and exporting oil and gas. Its crude oil exports through the Caspian Pipeline Consortium system pipeline, leading to the Black Sea port of Yuzhnaya Ozereyevka; and other outlet for crude oil is via the Atyrau-Samara pipeline, which connects to the Russian Transneft system allowing access to the port of Primorsk and other European destinations.
For this project, we are collaborating with Stroitelnaya Iniciativa LLP (STI) and our total manhour is 72,399.
SCOPE OF WORK
- New foundations, concrete structures (walls, slabs, supports, columns, pipe racks and pedestals).
- Repair of existing concrete and reinforced concrete structures (walls, supports, foundations, columns, pipe racks and pedestals)
- Repair or patching of Foundations, Concrete Structures (Walls, supports, foundations, columns, pipe racks and pedestals).
The Rakushechnoye field is located in Western Kazakhstan, on the Mangyshlak Peninsula, approximately 15 kilometres inland from the Caspian Sea and approximately 105km southeast of Aktau, a major regional center, as shown in the map above. The Rakushechnoye is within close proximity to export infrastructure; 120km to Aktau Port and 60km to main oil and gas pipeline.
Total manhour for this project is 17,600.
SCOPE OF WORK
a) Provision of maintenance services for downhole sampling and fluid analysis.
b) Maintenance services for the whole field development program at Rakushechnoye field:
- To install an Upper Limit Level Switch & remote monitoring Alarm.
- To install an Automatic Shut-off Valve & Electro Contact Manometer (HP gas).
- To develop an Emergency Response Plan for Rakushecnoye field (valid 5 years).
- To install Relief Valve (13 units) on vessels and storage tanks.